Estimate rectangular, circular and measured river pours, separate resin and hardener amounts, and plan kit purchases and lifts.

Saved projects
An editable example is loaded. Enter your measured dimensions, supplier prices and documented process settings. Saving creates an estimating project in your dashboard.
Live build drawing
500 mmDepth & lifts1 lift(s) · 10 mm totalMixed volume: 1.416 L for the batchVerify lift and batch limits against the exact resin’s technical sheet
Mixed epoxy for batch
1.416L
Resin A (volume)
0.944L
Hardener B (volume)
0.472L
Lifts per project
1
Each lift depth
10 mm
Net volume per project
1.288L

Material takeoff · batch of 1

Example costs are editable. Match only inventory with the same purchase unit, material and dimensions. Quantities reflect the generated plan.

Material / purchase unitQtyUnit costLine total
Matched resin + hardener kit3 L of mixed yield per complete kit; total batch requirement 1.416 L.1 kit$75.00
Mold, seal coat and mixing supplies1 set$20.00

Estimated batch selling price

Materials $95.00 · labor $90.00 · overhead $10.00
$253.50$253.50 per project · tax and sales fees separate

Build-package downloads

Project files reopen in WoodWorkCalc. Laser exports use millimeters and already include the entered kerf compensation.

Assumptions & limits

Ratio, density, maximum lift and cure time must come from the exact resin system’s technical data sheet. Weight and volume ratios are not interchangeable.

The river estimate integrates five equally spaced width measurements. Irregular cavities, seal coats and overflow need separate allowances.

Lift count addresses entered depth only. Temperature, total batch mass, mold geometry and the manufacturer’s batch-volume limit also control a safe pour.

Understand your build

Method & worked example

Rectangular volume = length × width × depth. Circular volume = π × radius² × depth. The river uses trapezoidal integration of five equally spaced width measurements. Volume-based mixes split total volume by the stated ratio; weight-based mixes also use both component densities.

Check the numbers

A 1,000 × 200 × 10 mm rectangular pour has a net volume of 2 L. A 10% allowance makes 2.2 L before multiplying by the number of projects in the batch.

A measured resin takeoff with a product-specific mixing record and editable project costs. The drawing, cut list, material plan and exports use the same entered measurements. Product geometry and purchase quantities are checked again when a project is saved.

For workshop instruction, follow the Academy learning paths. For saving revisions and moving a design into business records, use the design studio product guide.

Continue the project

References & further reading

Use actual stock dimensions and current manufacturer instructions. Supplier costs, physical material tests and hardware selections remain part of your project record.