Multi-sheet & Offcut Planner

Fit rectangular parts across mixed stock sizes, preserve grain, account for kerf and identify reusable offcuts.

Saved projects
An editable example is loaded. Enter your measured dimensions, supplier prices and documented process settings. Saving creates an estimating project in your dashboard.
Live build drawing
Edit dimensions
SideSideShelfShelfShelf1220 mmPlywood sheet · 2440 mm along grain · stock 1
Stock pieces used
1
Parts placed
5
Unplaced parts
0
Part area / used stock
36.354%
Reusable rectangles
4

Material takeoff · batch of 1

Example costs are editable. Match only inventory with the same purchase unit, material and dimensions. Quantities reflect the generated plan.

Material / purchase unitQtyUnit costLine total
Plywood sheet1220 × 2440 × 18 mm · Plywood1 sheet$65.00

Estimated batch selling price

Materials $65.00 · labor $90.00 · overhead $10.00
$214.50$214.50 per project · tax and sales fees separate

Build-package downloads

Project files reopen in WoodWorkCalc. Laser exports use millimeters and already include the entered kerf compensation.

Assumptions & limits

Layouts use a deterministic guillotine heuristic, not a guarantee of minimum stock. Shaded free rectangles exclude entered trim and kerf.

Understand your build

Method & worked example

Longest parts are placed first in non-overlapping free rectangles using a guillotine split. The planner prefers already-opened stock, then offcuts, then whole sheets. Material and thickness must match; grain-locked parts cannot rotate. This is a feasible heuristic, not a proof of minimum waste.

Check the numbers

Two 600 mm parts do not fit across 1,200 mm stock when a 3 mm separating kerf is required. Enough total area alone does not establish a feasible cutting layout.

Numbered cutting layouts, a stock pull list, unplaced-part checks and traceable reusable leftovers. The drawing, cut list, material plan and exports use the same entered measurements. Product geometry and purchase quantities are checked again when a project is saved.

For workshop instruction, follow the Academy learning paths. For saving revisions and moving a design into business records, use the design studio product guide.

Continue the project

References & further reading

Use actual stock dimensions and current manufacturer instructions. Supplier costs, physical material tests and hardware selections remain part of your project record.