Price a Project in WoodWorkCalc

A project price is dependable when each part of the cost base has a home. WoodWorkCalc helps you separate those inputs, review the result, and continue into Quotes once the job is ready to be discussed with a customer.

Before you begin

What you need

  • Write the project scope, dimensions, finish, hardware, delivery, and installation expectations.
  • Collect current material costs and make a realistic labor estimate.
  • Decide which uncertain items need a buffer, allowance, or separate line item before you price.
01

Check demand and production capacity

Use break-even units to compare selling price, variable cost and fixed costs for one period. Then use batch capacity to see how many attempted parts fit after setup and how expected yield affects output. Capacity does not guarantee sales; keep demand and actual shop performance separate from the estimate.

02

Price the work that surrounds the build

A project is not only material plus bench time. Include layout, setup, machining, assembly, sanding, finishing, cleanup, communication, delivery, installation, and the normal interruption cost of operating a shop. Use the calculator inputs to make those parts visible instead of relying on a padded total.

03

Use material and waste tools before the final price

Board-foot, sheet-yield, material-waste, cut-list, and kerf tools help turn a parts list into a protected material number. Use them before finalizing a project total when the stock plan is a meaningful part of the risk. The goal is not perfect prediction; it is a documented, reasonable allowance.

04

Know what Markup on cost means

Markup is profit divided by cost; margin is profit divided by the pre-tax selling price. A 20% markup produces a 16.67% margin, while a 25% markup produces a 20% margin. WoodWorkCalc’s homepage, breakdown, and dashboard Quotes now use the same cost-subtotal policy. Existing saved quotes keep their recorded totals; a reopened calculator scenario is recalculated. The tax field is an estimate on costs, not a jurisdiction-aware tax engine: confirm the correct tax basis before issuing a final quote.

05

Treat the first estimate as a record to improve

The price becomes more accurate when you compare its assumptions against a completed job. Once approved, continue through Jobs and Operations so actual time, material use, task friction, and changes can inform the next estimate.

Check the same estimate on both screens

Check the same estimate on both screens
Input or resultExample
Cost subtotal$1,000.00
Markup on cost · 25%+$250.00
Estimated tax on costs · 8%+$80.00
Total estimate$1,330.00
Margin before tax20.00%

Use a fresh scenario with no transferred calculator line. A different tax basis must be handled before the final client price is agreed.

Open the right workspace

Your next step

Common questions

Common questions

Should I create a quote before I know the price?

Use the calculator workflow to build the cost base first. Create or complete the quote once you can define the scope, number, and next client action clearly.

Where do I revisit an estimate after the job?

Use the linked quote, job, and operations record to compare planned assumptions with the work that actually happened.